Product Description
JWB Sequence Velocity Variator
one. Attributes:
JWB-X type
- Measurements: ≥04
- Power up to 1.5 kW or much more
- Cases in RAL 5571 blue forged iron
- Shafts: scenario hardened and tempered steel.
- Inner factors: heat-taken care of steel
- Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque worth max 1002Nm
- Silent, vibration-totally free operating
- Bidirectional rotation
- Handle handwheel positionable on either facet
- Slipping pace to max load at 5%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
JWB-X B sort
- Measurements:01,02,03 and 04
- Electricity up to 1.5 kW or much less
- Circumstances in die-forged aluminium alloy
- Shafts: case hardened and tempered steel.
- Inside elements: heat-taken care of steel
- Output velocity with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque value max 795 Nm
- Silent, vibration-free operating
- Bidirectional rotation
- Management hand wheel positionable on either facet
- Slipping pace to max load at 5%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
two. Specialized parameters
Type | Output Torque | Output Shaft Dia. | Output Pace Selection | 2rpm-950rpm | |
SWB01 | two.6-1.6N.m | φ11 | Relevant Motor Electricity | .18kW-7.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Input Alternatives | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheJiang SCZPT Push Co.,Ltd,the predecessor was a state-owned military mould enterprise, was set up in 1965. SCZPT specializes in the comprehensive energy transmission remedy for high-stop gear manufacturing industries based mostly on the aim of “Platform Product, Software Layout and Expert Service”.
SCZPT have a powerful complex pressure with more than 350 employees at present, such as in excess of thirty engineering professionals, thirty quality inspectors, covering an location of 80000 square meters and varieties of superior processing equipment and testing equipments. We have a good basis for the sector software advancement and service of high-end speed reducers & variators owning to the provincial engineering techCZPT investigation middle,the lab of equipment speed reducers, and the foundation of modern day R&D.
Our Staff
Good quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery
Below is a list of our currently offered industrial gearboxes. If you cannot locate what you are searching for, please get in touch with the manufacturing unit for far more choices. At EP, we are constantly developing new goods and retrofitting previous kinds to meet up with customer needs.