Our product assortment also covers locking assemblies (clamping components/locking gadget), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod ends and yokes. we offer chromed bar and tubes for hydualic and pheumatic cylinders. With EPG manufacturer registered in far more than 70 countries like America , Europe , Japan and so on, it has partners between entire world prime enterprises, this sort of as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, and so on. Product Description
LD design solitary girEPTToverhead crane is characterized by more affordable framework and higher energy metal as a EPTT crane. Single girEPTToverhead crane is more common when lifting capacity considerably less than 20T.
Utilized together with CD1 model MD1 product electric powered hoist as a comprehensive established, it is a ligEPTT duty crane with a ability .5 ton ~ 32ton. The span is seven.5m~ 22.5m. Functioning duty is A3~A5, doing work temperature is -25-40 ordmC.
This solution is commonly utilised in metal mills, warehouse,hydroEPTT station,production workshop, production line, resources shares,gear assembly etc to carry items.
EPTT data:
Item | Parameter | |
1 | EPTT Ability | one-30t |
two | The span | five-40m or on Reques |
three | EPTT Height | 3-30m orCustomized |
four | Lift pace | Variable pace (StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd) |
5 | The functioning responsibility | A5-A7 |
six | The working temperature | -twenty five~ 40C |
seven | EPTT supply | 380V,50Hz,3 phas |
Advantages of a solitary girEPTTdesign:
- Significantly less high-priced owing to a less difficult trolley design, lowered freigEPTT EPTTs, simplified and more quickly installation, and much less substance for the bridge and runway beams
- Most economical choice for ligEPTT to medium-duty cranes
- Reduced masses on the creating construction or foundations owing to a lowered EPTTweight. In several instances, it can be supported by eXiHu (West Lake) Dis.sting roof construction without the use of additional help columns.
- Far better hook technique for equally trolley travel and bridge journey
- Easier to install, service, and preserve
- Perfect for workshops, warehouses, content yards, and production and manufacturing faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties
- EPTTer load on runway rails or beams means less put on on the beams and finish EPTT wheels in excess of time
- Wonderful for faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties with low headroom
Detailed Images
Manufacturing Procedure
EPTT ampDelivery
1)StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd container EPTT
two)According to buyer quots specifications
Supply Time shipped in 25 daEPTTafter payment
Company Introduction
Certifications
Overseas Customers
Our Solutions
FAQ
1. Q: Are you manufacturing facility?
A: Sure, we are factory with 31 many years outdated.
2. Q: How EPTT is your warranty?
Our guarantee is 24 months following EPTTd the items.
three. The utilization period.
About thirty many years unEPTTcommon use.
four. How can we set up the crane?
Our senior engineer can be your aspect to do the set up XiHu (West Lake) Dis.Hu (West Lake) Dis. provider and coaching.
If you want our goods, remember to speak to with us ASAP! We will do our greatest for you!