a specialized supplier of a total assortment of chains, sprockets, gears, gear racks, V-belts, couplings and reducers. If you need any details or samples, remember to make contact with us and you will have our soon reply. PersonnelOur income individuals are effectively qualified to accommodate your requests and speak English for your ease.
EPTT Formal Cell EPTT EPTT Crane Qy50ka 50tons for Development
EPTT QY50KA EPTT crane’s composition is compact, the industry working efficiency is the greatest. EPTT functionality and driving overall performance of a comprehensive update, foremost competitors. Twin-pump confluence EPTT, operating efficiency of a extensive direct.
1. EPTTing lifting and driving performances
5 EPTT U-variety booms. The boom duration is 11.4m-forty three.5m with robust lifting efficiency, top 5%-ten% in advance of products with the exact same tonnages in the very same sector.
Large-EPTT motor with great dynamic overall performance, strong gradeability and excellent trafficability. The maXiHu (West Lake) Dis.mum gradeability and maXiHu (West Lake) Dis.mum travel velocity respectively are forty two% and 85km/h.
2. Dependability of heat dissipation, EPTT program etc. has been enhanced with safer procedure and driving
Waterproof connector clip is geared up with rubber sheath inside with exceptional h2o impervious and stage of protection reaches to IP65.
The air-conditioning condenser is individually set up, the warmth-sinking capacity is sharply enhanced and the atmosphere temperature reached to far more than 45 ordmC.
three. Mature and reliable double-pump confluence strategy, mainXiHu (West Lake) Dis.Hu (West Lake) Dis. the positive aspects of successful procedure
The double-pump confluence technique is adopted in elevating and falling of winch, extending and retracting of lazy boom and luffing, major in advance of luffing and extending and retracting functions.
four. Air-aid change EPTTs and 45% of shifting drive is lowered
The boost method will work only by stepping on the clutch that effectively avoids EPTT detrimental EPTTs when shifting. When compared with the same business, 100mm distance of shift EPTTs and 45% of shifting pressure are respectively diminished.
[Product Parameter]
Description | Unit | Parameter worth | |
Overall length | mm | 13930 | |
Overall width | mm | 2780 | |
All round Height | mm | 3630 | |
Axle foundation | 1st ,2nd axle | mm | 1470 |
2nd ,3rd axle | 4300 | ||
3rd ,4th axle | 1350 | ||
Wheel Base | mm | 2304 2075 | |
Entrance overhang/rear overhang | mm | 2389/2064or 2376/2064 | |
Entrance extension/rear extension | mm | 2131/226 or 2144/226 | |
Overall car mass in journey configuration | kg | 42200 | |
Axle load | Front axle | kg | 16200 |
Rear axle | 26000 | ||
Engine Model | WD615.338 | ||
Motor rated EPTT | kw/(r/min) | 276/2200 | |
Engine rated torque | N.m/(r/min) | 1500/1300-1600 | |
Max. travel pace | km/h | 85 | |
Min. constant travel velocity | km/h | 2~three | |
Min. turning diameter | m | 24 | |
Min. floor clearance | mm | 327 | |
Max. quality potential | % | 42 | |
Strategy angle | deg | 19 | |
Departure angle | deg | 15 | |
Braking length (at thirty km/h, full load ) | m | le10 | |
Oil usage per 100km | L | 40 | |
Exterior noise level for the duration of acceleration touring | dB (A) | le88 | |
Sound degree at seated placement | dB (A) | le90 |
[Item Image]
[Business Data]
[FAQ]
one: What variety phrases of payment can be recognized?
A: For phrases of payment, L/C, T/T, D/A, D/P, Western EPT (can be) could acknowledged.
2: What certificates are offered in EPTTry?
A: For the certification, we have CE, ISO, Gost, EPTA(United states of america)CCC.
3: What about the supply time?
A: 7-thirty daEPTTafter obtaining the deposit.
four: What about the guarantee time?
A: twelve months right after shipment or 2000 working several hours, whichever occuts initial.
5. What about the Minimum OrEPTTEPTTtity?
A: The MOQ is 1 pcs.