Our products are utilized in a lot of fields. There is a specialized centre of province stage, EPG academician doing work station, experiment station for EPG publish physicians, and national 863 software established up in EPG team. With these platforms and sturdy complex potential, the more than 400 professionals have designed all variety of special high precise and higher strength items, executed mold applications for key parts in the car and countrywide market revitalizing system, resulting more than 5000 developed over, amid which 33 objects are autonomous patent technology with 4 patent approved . Thanks to our sincerity in providing best provider to our clientele, knowing of your wants and overriding perception of obligation towards filling purchasing needs,
Very hot Sale Best Price tag CSD300 EPTT Mounted Drilling Rig with EPTT Elements for Borehole
Software
CSD300 Multi-useful EPTT mounted drinking water effectively drilling rig is a successful,multi-perform full EPTT h2o effectively
drilling rig.It is substantial effectiveness because of obtaining a more substantial torque of the turntable and is mostly utilized for h2o nicely in
sector and EPTT, national protection building foundation, geological exploration, geothermic effectively and other
basis working, it is common at property and overseas.
CSD300 EPTT mounted drilling rig can drilling in all varieties formations by mEPTTdrilling in gentle formation and air DTH
hammer in rock drilling,DTH Hammer is utilized in rock drilling, slag is discharged by air pressure and the offstage
effectiveness is 10 instances than traditional rotary drilling.
CSD300 deep water effectively drilling rigs, in chopping drilling or rotary drilling can be operated in unconsolidated layer, and
the slag can be discharged unEPTTby mud, the effect drilling procedure can also be adopted and slag can be discharged
by strain air, the EPTT h2o well drilling rig appropriate for drilling difficult geological circumstances.
Characteristics
one.The drilling rig can use air DTH Hammer drilling and mEPTTdrilling.
2.Centralized handle console is appropriate for every single manipulation and management. Fast pulling and lifting reduce the
auXiHu (West Lake) Dis.liary time and enhance the work efficiency.
three.The EPTT chassis adopts the 4X2 EPTT crane chassis of brand EPTTEPTT EPTT and the major EPTT technique, the
transfer scenario, EPTT, double-winch unit, mEPTTpump, turntable,drilling tower, feed system are set up on the chassis.
four.It really is a EPTTrotary drilling rig with directional circulation. It is equipped with BW250/BW450(Optional) mud
pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is geared up with ideal
drilling little bit.
five.The EPTT of drilling rig arrives from a EPTchai engine,93kw EPTchai engine EPTTs the massive displacement substantial
stress plunger pump and it is characterised by EPTTful dynamic and steady efficiency.
6.The rotary head,rotation velocity is -100rpm stepless adjustment and the rotary torque is 3200-4500Nm.
seven.The pulling force can be controlled and managed, which adapt the EPTT to deep gap drilling.
8.It can set up a generator which is handy to welding or illuminate for operate at night time.
9.Primary winch are offered on the rig so it is substantial effectiveness when the rig drill on mEPTTrock and on the weathering
development.
ten.The principal EPTT of rig is hydrulic and the 4 lXiHu (West Lake) Dis.Hu (West Lake) Dis. legs and drilling tower are EPTT managed. Transfer situation
and mEPTTpump clutch technique are also EPTT operated.
11.The equipment winch winch is utilised for auXiHu (West Lake) Dis.liary lifting and casing,optional major winch drive of one.5T, rope size of
100m.
twelve.The EPTT auXiHu (West Lake) Dis.liary capabilities are straightforward and productive for XiHu (West Lake) Dis.Hu (West Lake) Dis. extension, growth swing, increase elevate, XiHu (West Lake) Dis.Hu (West Lake) Dis.
dumping.
Specification
one | Geology drilled | All sorts | |
two | Drilling kind | DTH amp MEPTTrotary | |
three | Drill method and procedure | EPTT | |
four | Hole Diameter | mm | Phi90- Phi325 |
5 | Hole Depth | m | 300 |
6 | Rotation Torque | Nm | 4500-8500 |
seven | Rotation Velocity | rpm | -100 |
8 | Drill pipe diameter | mm | seventy six,89,102,114 |
9 | Drill pipe duration | mm | 3000/4500/6000 |
ten | Max. EPTT drive | N | 8000 |
eleven | Max. Feed Speed | m/min | 18 |
12 | Feed Stroke | mm | 3400 |
Winch | |||
13 | EPTT power of hoist | T | .eight |
14 | Length of steel wire rope(resource winch) | M | one hundred |
Engine | |||
fifteen | EPTT Motor variety | YUCHAI | |
sixteen | Rated Horse EPTT | Kw | ninety three |
seventeen | EPT Technique | V | 24 |
Compressor Required | |||
18 | Compressor Variety | Rotary Screw/Movable | |
19 | Pressure Essential | Mpa | one.2-three. |
twenty | Air consumption | m sup3/min | 11-35 |
EPTT | |||
21 | Producer | EPTTEPTT/XiHu (West Lake) Dis.HU (WEST LAKE) DIS.FENG | |
22 | Product | E13N2B00098 | |
23 | Engine | YC4E140-42 | |
24 | Rated Horse EPTT | HP | 140 |
twenty five | Discharge StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | EU-2 | |
26 | Drive sort | four*two | |
27 | Max.Velocity | Km/h | 102.nine |
28 | Steering wheel | still left/right(Optional) | |
MEPTTEPTT(Optional) | |||
29 | Type | EPTT | |
thirty | Model | BW450 | |
31 | Stroke | mm | a hundred and ten |
32 | Displacement | L/Min | 450 |
33 | Discharge force (Mpa) | Mpa | two-five |
34 | Suction tube diameter | mm | 89 |
35 | Discharge pipe diameter | mm | 51 |
36 | Liner Diameter | mm | 80 |
Dimension | |||
37 | Net Bodyweight | T | 15 |
38 | EPTT Duration | mm | 10600 |
39 | EPTT Width | mm | 2400 |
40 | EPTT Peak | mm | 3050 |
41 | Functioning dimension(L*W*H) | mm | 11000*2480*2850 |
EPTT amp Shipping
Provider
In our following revenue provider technique, We build best handle system strictly in accordance to ISO-9000 collection, in this program, EPTT date and difficulty solve answer and preventive actions will be provided in any keep undertaking, all the spare areas will be used in new OEM products with set up recommendations, EPTT checklist, manufacturer’s instruction, qualification and Warranty certificate.
We supply quotone equipment amp one scenario, endless support, particularly the after revenue provider commence from the orEPTTconfirmation, final for the doing work daily life of the gear.