Quality and credit are the bases that make a company alive. Maintaining in head that very good services is the crucial to cooperating with clients, we try to meet up with large quality requirements, provide competitive rates and make sure prompt shipping. PersonnelOur product sales persons are nicely qualified to accommodate your requests and talk English for your comfort.
Solution Description
2016 shengqo 5t 10t 20t 30t 50t 100t EPTT GirEPTTBridge Crane for Industry Software
Part one colon Description and Software
EPTT girEPTTcranes give a greater heigEPTT of elevate in provided headroom as the hook travels in between the beams time period With open up winch trolley as its lifting system comma they are offered in higher capacities than solitary girEPTTand for heavy duty programs period of time
Overhead Cranes are obtainable with a huge range of personalized alternatives in capacities up to 700t and span up to 60m comma supporting with all dependable substance managing solutions interval Our crane supplies an superb total price interval
They are also cab be Custom Made for extreme apps and severe environments period of time Locate out far more by e mail us period of time
Component two colon In depth Configuration colon
one- EPTT Mechanism
-open up winch trolley blended with motor comma EPTT comma EPTT brake comma drum comma hook comma sheaves comma coupling comma brake drum and many others period
-Rigid box sort trolley frame
– Wound Rotor 3-phase asynchronous motor
– Harden Tooth EPTT
– EPTT Drum Brake
-Plate-rolled Drum kits
2-Stop Carriages
-Solid Flanged wheel
-Rigid welded box sort beam
-compact layout
three-Griders
-2 principal girders are welded box variety
-EPTT colon carbon metal with substantial high quality of Q235B or Q345B
-The primary girEPTTis related by energy bolt interval
-Weld joint examined by X ray or ultrasonic examination semi
– Modula design
– Designed Deflection le1 sol800 of span
4-Control
-Cabin control
-Independent pendent control as selection
-Wi-fi management as option
5-Electric powered Component
-Conductor EPTT supply
-All hoist and crane actions are unbiased and can be operate EPTTltaneously period
-Security degree IP55
-The components are positioned in a routine maintenance pleasant way comma and the EPTT format provides with good safety
-Festoon cables are suspended on cable saddles comma set to cable trolleys comma operating in a galvanized C-keep track of period
six-Painting
-corrosion security by means of rust removing by mechanical shot blasting SA two period5
-Initial layer of coating epoxy thirty microns
-Next layer of coating epoxy 30 microns
-Third Layer of coating of polyurethane forty microns
-Typical thickness colon about 100 microns
-Shade colon yellow or Orange as for each requirements
seven-Protected Defense
-Crisis-off change
-Overload defend
-Earth security
-Zero Situation Security
-Cross vacation and EPTT journey security
-EPTT vacation safety
-Overheating security of motor
-Geared up with rainproof products
– Alarm Bell and Lamp
Portion three colon Sketch amp EPTT Knowledge lpar StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd a single rpar
We also can manufacturing the crane according to specifications
Capacity |
32t | |||||||
Span | S lparm rpar | seven period5 | 10 period5 | 13 period5 | 16 period5 | 19 period5 | 22 period5 | 25 period5 |
EPTT peak | m | 9 | 9 | 9 | nine | 9 | nine | 9 |
EPTT pace | m solmin | three | three | three | three | 3 | 3 | three |
Trolley speed | m solmin | 16 | 16 | 16 | sixteen | sixteen | sixteen | 16 |
Crane pace | m solmin | twenty | 20 | 20 | 20 | 20 | 20 | 20 |
EPTT motor | kw | eighteen period5 | eighteen period5 | eighteen period5 | 18 period5 | eighteen period5 | eighteen period5 | eighteen period5 |
Trolley motor | kw | two period2 | two period2 | two period2 | 2 period2 | 2 period2 | two period2 | two period2 |
Complete bodyweight | kg | 12530 | 14660 | 16360 | 18870 | 21650 | 24260 | 27000 |
Max Wheel Load | KN | 167 | 185 | 195 | 205 | 215 | 225 | 233 |
Track | P43 | P43 | P43 | P43 | P43 | P43 | P43 | |
Primary dimension | mm | 7 period5 | 10 period5 | 13 period5 | 16 period5 | 19 period5 | 22 period5 | 25 period5 |
Rail best to primary leading | H1 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 | 1900 |
Rail top to hook centre | H2 | -seven-hundred | -seven-hundred | -700 | -seven-hundred | -700 | -seven-hundred | -seven-hundred |
Wheel foundation | W | 3600 | 3600 | 4000 | 4000 | 4500 | 4500 | 4500 |
Crane width | B | 5000 | 5000 | 5400 | 5400 | 5800 | 5800 | 5800 |
Hook still left limitation | S1 | 1100 | 1100 | 1100 | 1100 | 1100 | 1100 | 1100 |
Hook rigEPTT limitation | S2 | 1600 | 1600 | 1600 | 1600 | 1600 | 1600 | 1600 |
Trolley gauge | K | 2000 | 2000 | 2000 | 2000 | 2000 | 2000 | 2000 |